A homeowner solar proposal is the written record of what is being offered: the equipment, the estimated production, the price, and the limits of the work. In a tighter market, that record is read more carefully. The Solar Energy Industries Association (SEIA) Solar Market Insight Report Q3 2026 (retrieved 2026-11-25, https://seia.org/research-resources/solar-market-insight-report-q3-2026/) outlook for the 2026 residential solar sector was a 23% contraction. An inflated savings claim or a missing assumption is harder to defend when buyers compare documents line by line.

The notes below are a practical checklist for a written proposal. They are not a legal template and they do not replace your contract, licence, or insurance terms.

1. Exact equipment and quantities

Avoid vague labels such as “high-efficiency panels” or “premium inverter.” List the manufacturer, exact model, and quantity of each primary component:

If a supplier later forces a substitution, a written model list makes the change visible and lets you document an equivalent replacement instead of arguing from memory.

2. Production estimates, with the assumptions written down

Disputes often start when measured generation is lower than a figure the owner remembers from the proposal. Give an estimated annual production in kWh, and state that it is an estimate. Then list the assumptions used to produce it, for example:

Do not promise or guarantee a specific financial saving. Retail rates, export rates, and household consumption can change, and they are largely outside the installer’s control. If you show a bill or payback illustration, label the tariff and usage assumptions and state that they may not hold.

3. Price, inclusions, and exclusions

State the total price clearly, and say what it includes. List work or materials that are not included and will need a separate change order if they arise — for example, a main-service-panel upgrade or unforeseen roof repair, if those are outside your standard scope.

If the proposal mentions a tax credit, rebate, or other incentive, name the exact program and verify from official program documents that it is still in force for that customer and that project before the document goes out. Do not present an incentive as a guaranteed reduction in the contract price. Add a short disclaimer that you are not a tax adviser and that the owner should confirm eligibility with a qualified tax professional.

4. Warranties, separated by who stands behind them

Summarise warranties from the current manufacturer documents for the exact models in the proposal, and keep your own workmanship warranty distinct.

EnergySage’s article on solar panel warranties (updated 2025-08-14, retrieved 2026-11-25, https://www.energysage.com/solar/solar-panel-warranties/) distinguishes a product warranty, which covers the integrity of the equipment, from a power or performance warranty, which states a minimum output over a defined term. EnergySage states that many manufacturers offer at least 10 years of product coverage, that power warranties commonly run 25 years, and that those power warranties frequently guarantee at least around 80% of original output at the end of the term. Treat those figures as EnergySage’s description of common practice, not as the terms of the panels you are selling. Copy the actual years, retained-output percentage, and exclusions from the manufacturer PDF.

EnergySage also notes that labour and shipping for a replacement are often not included, or are included only up to a limit. If your company offers a separate workmanship warranty (for example, for roof penetrations or installation labour), state its length and what it covers, separately from the factory terms. Note whether a warranty is transferable if the house is sold, if that information is in the document you are quoting.

5. Permitting, interconnection, and timeline

Describe who will prepare the permit and interconnection paperwork, and say that review times belong to the AHJ and the utility. Do not guarantee an approval date or a permission-to-operate date. If a PE stamp or a structural letter may be required, say so in plain language and say who is responsible for obtaining it.

An unstamped proposal layout, if you attach one, should be labelled as a discussion drawing, not as a sealed permit set.

Next step

To see how a simple generation estimate presents its assumptions, our free tool at https://www.wg-solar.com/tool.html provides reference annual yields attributed to PVGIS v5.3 (European Commission JRC). It assumes a fixed-mounted crystalline-silicon system, 30° tilt, 14% system losses, and long-term average weather for selected European and Australian cities. It does not cover US cities, and it is not a US site assessment, a design, a quotation, or a guarantee of performance.

WG SOLAR PTE. LTD. organizes supplier data and prepares written summaries of the files you send. For unstamped layout drawings and supplier-document packs from $165 or written solar and storage consulting from $320, email info@wg-solar.com.

An enquiry is not an order. Prices exclude VAT where applicable, and the final price is confirmed in writing after we review the files or data provided.

WG SOLAR PTE. LTD. is a Singapore-registered company and works in writing only.