How US Solar Installers Can Prepare Warranty Claim Paperwork

For a small US solar installation or repair company, a failed inverter or other warrantied part creates two jobs. The first is field work: diagnose the fault and, if appropriate, replace the equipment. The second is paperwork: gather the technician’s notes, photos, serial numbers, and sign-off records before anyone logs into a manufacturer portal.

If those files stay in a backlog, a claim can sit until a deadline has passed or until the technician no longer has easy access to the missing photo. This article is a practical checklist for organizing a review pack before submission. It is not a promise that a manufacturer will accept a claim, and it is not legal advice.

Start with a complete file for each case

Before a portal form is filled in, it helps to assemble one pack per case. A useful pack usually includes:

Manufacturer portals often ask for a case or RMA number as well. Keep that number in the same index so it is not stored only in someone’s inbox.

Common gaps that stall a file

Many delays start after the technician has left the site. A short missing-items list, written before submission, makes those gaps visible. Typical problems include:

Once the gaps are listed, a short written request to the field technician can ask for the missing item from logs or photos already taken, rather than leaving the gap until the portal rejects the file.

These examples are types of missing paperwork, not a real work order and not evidence that any particular brand will refuse a claim for that reason alone.

Brand terms differ — read the current official page

There is no single paperwork rule for every solar manufacturer. The installer should check the brand’s current official warranty or compensation page for the product and country in question, including who may perform the work, what must already be approved, and how long the installer has to apply after a replacement is accepted or shipped.

SolarEdge’s US page on submitting a non-product-related claim, which also states terms for its RMA Compensation Plan (retrieved 2026-11-25, https://www.solaredge.com/us/generic-claims), includes the following conditions. They apply to that plan; they are not a universal rule for every manufacturer:

The same page states that SolarEdge may approve or reject a compensation claim, may require additional documents, and may revise, suspend, or terminate the plan. SolarEdge’s decision on matters relating to the plan is described as final and binding. An organized file still does not guarantee approval.

What written administrative help can and cannot do

If office staff are already carrying a backlog, written document preparation can be outsourced: indexing the files you already have, listing missing items, and drafting an English request for a missing photo or date. That work is unstamped. It is not a PE seal, not a field diagnosis, and not a decision on whether the claim is eligible.

The US installer or repair contractor remains responsible for judging the fault, confirming eligibility under the manufacturer’s current terms, signing the file, and submitting it. An external assistant should not be given portal passwords, should not contact the homeowner, and should not submit the claim in the contractor’s name.

Agree in writing, before files are shared, that the materials are authorized, that personal data is removed or limited as you require, where the files will be held, who will review the pack, and when the files will be deleted after delivery.

Next step

To have your warranty-claim paperwork organized, order on Fiverr from $90 (for example a batch of 3 claims). You can also email info@wg-solar.com. WG SOLAR PTE. LTD. compiles supplier data and written summaries of the files you send. We do not submit claims on your behalf or guarantee approval. See also US services — warranty claim administration.

Order on Fiverr在 Fiverr 下单

A separate free tool at https://www.wg-solar.com/tool.html provides reference annual yields attributed to PVGIS v5.3 (European Commission JRC) for selected European and Australian cities. It assumes a fixed-mounted crystalline-silicon system, 30° tilt, 14% system losses, and long-term average weather. It is not a US site assessment, a design, a quotation, or a guarantee of performance.

An enquiry is not an order. Prices exclude VAT where applicable, and the final price is confirmed in writing after we review the files or data provided.

WG SOLAR PTE. LTD. is a Singapore-registered company and works in writing only.